The Cake Is A Lie
Shambles ESU (Derbyshire)
| Start time |
End time |
Duration |
Distance |
Average speed |
| 19:13:08 |
00:51:32 |
05:38:24 |
5 km |
0.8 km/h |
| Control |
Description |
Time |
Points |
| 07 |
Charred tree stump |
19:26:51 |
5 |
| C |
On The Ropes (Old quarry) |
19:48:16 |
50 |
| B1 |
Bonus control 1 |
19:54:53 |
0 |
| 11 |
Exposed tree roots |
20:05:08 |
20 |
| H |
Bullseye! (Woodland track) |
20:19:02 |
50 |
| B2 |
Bonus control 2 |
20:33:46 |
0 |
| L |
Keeping a Log (Track over stream) |
20:47:14 |
50 |
| N |
Flag Pipes (Track over stream) |
21:17:51 |
50 |
| K |
Commercial Break (Roundhouse) |
21:59:43 |
50 |
| X2 |
|
22:15:19 |
-25 |
| M |
UXB (Edge of field) |
22:47:47 |
50 |
| G |
Supersledge (Grassy slope) |
23:17:09 |
50 |
| 13 |
Under bridge |
23:32:58 |
10 |
| D |
Cave On The Go (Double gates) |
23:48:35 |
50 |
| B |
Dark Water (Lake) |
00:13:03 |
50 |
| 06 |
Up tree |
00:23:46 |
5 |
| A |
Chickin Lickin' (Most easterly pond) |
00:37:54 |
50 |
| SUB-TOTAL |
540 |
| SUPER SCORE POINTS |
170 |
| TIME PENALTIES DEDUCTED |
0 |
| TOTAL |
685 |
Route map
Map reproduced from Ordnance Survey mapping with their permission, on behalf of the controller of Her Majesty's Stationery Office.
Back to main results table